AllFreePapers.com - All Free Papers and Essays for All Students
Search

Design Consultant Main Contractor Contractual Completion Date

Autor:   •  April 29, 2015  •  Essay  •  596 Words (3 Pages)  •  927 Views

Page 1 of 3

 Project Manager                                

RW Armstrong

Design Consultant

EWAN

Main Contractor

Consolidated Contracting Engineering & Procurement SAL-Offshore

Contractual Completion Date

No. of Days Left for Completion

Weather

  ▢ Dusty   ▢ Sunny    ▢ Cloudy/Shower     [pic 6]

Humidity

▢ High    ▢ Medium    ▢ Low     [pic 7]

Temperature 0C

 

Max

30

Min

20

Contractor's Manpower

Subcontractor's Manpower

Category

Day Shift

Night Shift

Category

Day Shift

Night Shift

Name

Indirect

Direct

Sr. PROJECT MANAGER

1

0

PROJECT MANAGER

1

0

MECH-ENGINEER

1

0

ELEC-ENGINEER

1

0

QA/QC Engr.

1

0

MEP DRAUGHTS MAN

6

0

SECRETARY

1

0

ELECTRICAL FOREMAN

1

0

PLUMBING FOREMAN

2

0

Electricians

4

0

 

Plumbers

14

0

 

 

 

Duct Man

0

0

 

 

 

CHW.Pipe Fitter

0

0

 

 

 

Storekeeper

1

0

 

 

 

Safety Officer

1

0

 

 

 

Fire Fighting

0

0

 

 

 

Time Keeper

0

0

 

 

 

Mech-Helper

05

0

 

 

 

Elec-Helper

05

0

 

 

 

 

 

 

 

 

 

TOTAL

45

00

TOTAL

The contents of this report are a description of items related to the ongoing works or works completed during the day and indicative for the material & manpower on site, and should not in any case be considered a reference document for any contractual implication.

EQUIPMENT

I=Idle

R=Repair

Type

Qty

Hours Worked

Status

Hilti M/c tool

01

Jack hummer

01

Drill M/C

02

Grinder 4“

02

Grinder 7“

03

Grinder 8“

02

Air Blower

02

Welding M/c (PPR)

03

Heat Gun (PVC)

02

Manual pressure pump

01

Jigsaw cutter

02

Chawkshaw cutter

02

General hand tool box

10

3 Ton Pickup / Grader ( 1 /0 )

01

Bus 14 Seater (1) / 34 Seat (1)

02

D/c Pickup

01

Material Demand
Visitors to site
Sub Contractor’s Equipment

Item

Unit

Qty

Name of supplier

HDPE PIPES & FITTINGS

VAR

COSMOPLAST.

PVC CONDUITES & ACCESSORIES

VAR

M.K.

The contents of this report are a description of items related to the ongoing works or works completed during the day and indicative for the material & manpower on site, and should not in any case be considered a reference document for any contractual implication.

...

Download as:   txt (6.6 Kb)   pdf (1.3 Mb)   docx (107.2 Kb)  
Continue for 2 more pages »