AllFreePapers.com - All Free Papers and Essays for All Students
Search

Measurements of Things

Autor:   •  April 11, 2016  •  Study Guide  •  1,542 Words (7 Pages)  •  649 Views

Page 1 of 7

1. Project Country: Timor Leste

1. Project Location:

Name:

Longitude: Latitude:

1. Project Capacity: P.E. (Population Equivalent)

1. Source of Raw Water: *River/Lake/Reservoir/Other:

Nature of Raw Water: *Fresh/Salt/Other:

1. The Name of unloading Port:

The distance from Port to selected site: in km

1. The name of City nearest to the site:

The population of the City:

The distance from City centre to selected site: in km

1. Any available road access to the location site: Yes/No.

If Yes, the condition of the road:

If No, do river transport available to site:

1. Average Rainfall per annum in location area: mm/year

1. Surrounding areas:-

Any industry factory or factories within 5 km in radius at location: Yes/NO.

If yes, state the nature of factory/factories:

Any village or inhabitants within 5 km in radius at location: Yes/No.

If Yes, try to give briefly the number of village:

1. Price for water consumption in local currency per M³ for

Industrial: per M³

Commercial: per M³

Residential: per M³

1. Price for Electricity in local currency per kW/ for:

Industrial: per kW

Commercial: per kW

Residential: per kW

1. Price for Diesel in local currency per litre: /litre

Price for Petrol in local currency per litre: /litre

1. Wages and/or Salary in local currency per day/month for:

General

...

Download as:   txt (3.9 Kb)  
Continue for 6 more pages »