Walt Disney
Autor: andrey • September 3, 2011 • Study Guide • 364 Words (2 Pages) • 1,952 Views
raw a Process Flow Diagram of the cranberry process beginning with
Receiving and ending with the Bailey Mills (i.e., no need to show Bulking
and Bagging at the end of the process). (~5 pts)
3. Compute the Capacity in barrels per hour of each process step. (~ 5 pts)
4. Consider a peak harvest day (16,800 barrels of berries unloaded with 70% of
them wet harvested). Assume that trucks arrive uniformly over a period of 12
hours. Identify the Bottleneck of the process by calculating/estimating the
implied utilization of each process step. (~ 6 pts)
5. When would processing be completed on such a peak harvest day? (~ 4 pts)
6. When would the last truck unload and how long would it have waited?
(~ 4 pts)
7. If you were Hugh Schaeffer, what changes would you make to improve
performance of the process? Estimate the magnitude (in $) of the costs and
benefits of each of your proposed changes. (Hint: Is there a difference in
benefits offered by the first dryer and the second dryer?) (~ 7 ptsCase Preparation Questions:
1. What are the performance problems facing receiving plant No. 1 (RP1)?
Describe the performance problems, not the underlying causes, and discuss
which are more important by roughly estimating their impact on profits.
(~ 6 pts)
2. Draw a Process Flow Diagram of
...