Minute Meeting
Autor: apiwat tantipornanan • June 6, 2016 • Essay • 398 Words (2 Pages) • 879 Views
Topics : SAP Operation Incident
Date/Time: 24 June 2015 / 10.00-14.00
Location: BAT Meeting Room ,floor.1
Attendees: Pathaveeroje Chaemchaeng ,Sasithorn Sutewannopas,
Purin Boonlue,Wassan,Anucha,Pachrawalai Maythayodom
Prepared By: Pacharawalai Maythayodom
[pic 1]
Summary Minutes BAT issue
1. Cutting marker was changed. So BAT have to update marker list .Fill data into the SAP system by barcode. If standard goods do not put amount but repair goods must be put amount. Fabric cord add the suffix color
2.BAT can’t open PO. Kanban system, PO number is issued each time. Is supplier confusing.
3.Revers inventory to expend
9T120-32000-CL------------------------------------------------->Part No.
WONDER THREAD 180D DIA0006 COL602(LWR)----->Part Name
TTTC---------------------------------------------------------------->Supplier
Ask for BAT cooperation
3.Inventory stock. Transaction was be input after physical inventory posted.
All transaction should be completed end of month
- Good receive
-Goods issue (Issue invoice)
4.MRP demand. Forecast data input. Input forecast data to SAP timely
5.Inventory stock. Inventory stock operation.
- After part is produced , it should be input stock at that time.
-FG (Sawing/Interior/Sun visor line)
-Semi-FG (Cutting line)
- Goods receive operation mute be done timely
6.Master data. Master data maintain.
- BAT should assign person in charge to maintain master data
-Master data
-BOM
-Routing (Activity time)
-costing
- BAT should understand SAP workflow clearly
-Business flow
-System flow
- Trading to production part (TBHN->BAT)
-Set migration date
-Set PIC
-Confirm process
Summary Ask for BAT cooperation
BAT acknowledge
End meeting 14.00
1. Cutting marker was changed. So BAT have to update marker list .Fill data into the SAP system by barcode. If standard goods do not put amount but repair goods must be put amount. Fabric cord add the suffix color
...