AllFreePapers.com - All Free Papers and Essays for All Students
Search

Project Report on Gupta Ji and Looknbook

Autor:   •  December 22, 2015  •  Case Study  •  2,115 Words (9 Pages)  •  1,048 Views

Page 1 of 9

Project Report

On

Gupta Ji and Looknbook

Submitted in Partial Fulfilment of the Requirement for

Post Graduate Diploma in Management

Course: Designing Work Organizations

Course Instructor: Prof. Nishant Uppal

Dated: 15th December, 2015

Submitted by: Group 7 - Section F

All the members mentioned below have made equal contributions to this project. Please find below the individual contribution of each member:

Name PGP ID Contribution

Vaibhav Lalwani FPM16005 Analysed the situation with respect to organizational theories.

Avin Chanana PGP31312 Interacted with Gupta Ji, and enquired details about their taxi services. Conducted a survey to estimate the demand for taxis by students of IIML and their satisfaction with the current services provided by Gupta Ji.

Anjani Golla PGP31322 Interacted with the employees of Looknbook and estimated their annual profit based on information obtained.

Nilesh Soni PGP31334 Interacted with Gupta Ji, and enquired details about their taxi services. Conducted a survey to estimate the demand for taxis by students of IIML and their satisfaction with the current services provided by Gupta Ji.

Nimisha Sankhe PGP31344 Analysed change required with respect to external forces.

Suyash Sengar PGP31354 Analysed points of synergy for the two entities and driving forces for change

Ajit Choudhary PGP31427 Interacted with the employees of Looknbook and analysed restraining forces

Acknowledgements

We thank our entire team for putting efforts for making this report a success. We would like to thank the employees of Looknbook and Gupta Ji and his employees for volunteering to give crucial information.

We would like to thank our course instructor Prof. Nishant Uppal for providing us the opportunity to pursue a project such as this and for his support and guidance throughout the course of the project.

Table of Contents

Acknowledgements 1

Table of Contents 1

1. Introduction 2

2. Present Scenario 3

2.1. Gupta Ji 3

2.2. Looknbook International Pvt. Ltd. 4

3. Synergy

...

Download as:   txt (14.7 Kb)   pdf (200.3 Kb)   docx (15.3 Kb)  
Continue for 8 more pages »